10년 금 시세 추이 (KWD, 온스당)

10년 동안 KWD 기준 온스당 금 시세: KWD 392.45(2016. 10. 15.)에서 KWD 1,282.23(2026. 10. 19.)로 +226.72% 변동. 최고 KWD 1,554.93(2026. 2. 15.), 최저 KWD 358.38(2016. 12. 15.).

10년 금 시세 추이 (KWD, 온스당)

요약

시작 (2016. 10. 15.)KWD 392.45
최신 (2026. 10. 19.)KWD 1,282.23
고가 (2026. 2. 15.)KWD 1,554.93
저가 (2016. 12. 15.)KWD 358.38
평균KWD 669.54
변동+KWD 889.78 (+226.72%)

과거 데이터

기간시가고가저가종가
2026-10 KWD 1,293.40KWD 1,299.12KWD 1,282.23KWD 1,282.23
2026-09 KWD 1,337.80KWD 1,337.80KWD 1,337.80KWD 1,337.80
2026-08 KWD 1,366.29KWD 1,366.29KWD 1,366.29KWD 1,366.29
2026-07 KWD 1,261.60KWD 1,261.60KWD 1,261.60KWD 1,261.60
2026-06 KWD 1,309.61KWD 1,309.61KWD 1,309.61KWD 1,309.61
2026-05 KWD 1,420.81KWD 1,420.81KWD 1,420.81KWD 1,420.81
2026-04 KWD 1,462.32KWD 1,462.32KWD 1,462.32KWD 1,462.32
2026-03 KWD 1,504.13KWD 1,504.13KWD 1,504.13KWD 1,504.13
2026-02 KWD 1,554.93KWD 1,554.93KWD 1,554.93KWD 1,554.93
2026-01 KWD 1,472.23KWD 1,472.23KWD 1,472.23KWD 1,472.23
2025-12 KWD 1,334.70KWD 1,334.70KWD 1,334.70KWD 1,334.70
2025-11 KWD 1,265.94KWD 1,265.94KWD 1,265.94KWD 1,265.94
2025-10 KWD 1,256.95KWD 1,256.95KWD 1,256.95KWD 1,256.95
2025-09 KWD 1,136.15KWD 1,136.15KWD 1,136.15KWD 1,136.15
2025-08 KWD 1,043.23KWD 1,043.23KWD 1,043.23KWD 1,043.23
2025-07 KWD 1,034.55KWD 1,034.55KWD 1,034.55KWD 1,034.55
2025-06 KWD 1,038.58KWD 1,038.58KWD 1,038.58KWD 1,038.58
2025-05 KWD 1,024.95KWD 1,024.95KWD 1,024.95KWD 1,024.95
2025-04 KWD 996.77KWD 996.77KWD 996.77KWD 996.77
2025-03 KWD 923.98KWD 923.98KWD 923.98KWD 923.98
2025-02 KWD 896.72KWD 896.72KWD 896.72KWD 896.72
2025-01 KWD 839.41KWD 839.41KWD 839.41KWD 839.41
2024-12 KWD 820.21KWD 820.21KWD 820.21KWD 820.21
2024-11 KWD 821.14KWD 821.14KWD 821.14KWD 821.14
2024-10 KWD 833.22KWD 833.22KWD 833.22KWD 833.22
2024-09 KWD 796.36KWD 796.36KWD 796.36KWD 796.36
2024-08 KWD 765.08KWD 765.08KWD 765.08KWD 765.08
2024-07 KWD 742.77KWD 742.77KWD 742.77KWD 742.77
2024-06 KWD 720.47KWD 720.47KWD 720.47KWD 720.47
2024-05 KWD 728.22KWD 728.22KWD 728.22KWD 728.22
2024-04 KWD 722.02KWD 722.02KWD 722.02KWD 722.02
2024-03 KWD 668.43KWD 668.43KWD 668.43KWD 668.43
2024-02 KWD 626.62KWD 626.62KWD 626.62KWD 626.62
2024-01 KWD 630.03KWD 630.03KWD 630.03KWD 630.03
2023-12 KWD 627.55KWD 627.55KWD 627.55KWD 627.55
2023-11 KWD 614.54KWD 614.54KWD 614.54KWD 614.54
2023-10 KWD 593.48KWD 593.48KWD 593.48KWD 593.48
2023-09 KWD 593.48KWD 593.48KWD 593.48KWD 593.48
2023-08 KWD 594.40KWD 594.40KWD 594.40KWD 594.40
2023-07 KWD 604.32KWD 604.32KWD 604.32KWD 604.32
2023-06 KWD 601.84KWD 601.84KWD 601.84KWD 601.84
2023-05 KWD 617.02KWD 617.02KWD 617.02KWD 617.02
2023-04 KWD 619.49KWD 619.49KWD 619.49KWD 619.49
2023-03 KWD 592.55KWD 592.55KWD 592.55KWD 592.55
2023-02 KWD 574.58KWD 574.58KWD 574.58KWD 574.58
2023-01 KWD 587.90KWD 587.90KWD 587.90KWD 587.90
2022-12 KWD 556.93KWD 556.93KWD 556.93KWD 556.93
2022-11 KWD 534.31KWD 534.31KWD 534.31KWD 534.31
2022-10 KWD 515.42KWD 515.42KWD 515.42KWD 515.42
2022-09 KWD 520.68KWD 520.68KWD 520.68KWD 520.68
2022-08 KWD 546.70KWD 546.70KWD 546.70KWD 546.70
2022-07 KWD 536.79KWD 536.79KWD 536.79KWD 536.79
2022-06 KWD 569.01KWD 569.01KWD 569.01KWD 569.01
2022-05 KWD 572.72KWD 572.72KWD 572.72KWD 572.72
2022-04 KWD 599.98KWD 599.98KWD 599.98KWD 599.98
2022-03 KWD 603.39KWD 603.39KWD 603.39KWD 603.39
2022-02 KWD 574.89KWD 574.89KWD 574.89KWD 574.89
2022-01 KWD 562.50KWD 562.50KWD 562.50KWD 562.50
2021-12 KWD 554.45KWD 554.45KWD 554.45KWD 554.45
2021-11 KWD 564.36KWD 564.36KWD 564.36KWD 564.36
2021-10 KWD 550.42KWD 550.42KWD 550.42KWD 550.42
2021-09 KWD 549.80KWD 549.80KWD 549.80KWD 549.80
2021-08 KWD 552.90KWD 552.90KWD 552.90KWD 552.90
2021-07 KWD 560.02KWD 560.02KWD 560.02KWD 560.02
2021-06 KWD 568.39KWD 568.39KWD 568.39KWD 568.39
2021-05 KWD 573.03KWD 573.03KWD 573.03KWD 573.03
2021-04 KWD 545.15KWD 545.15KWD 545.15KWD 545.15
2021-03 KWD 532.15KWD 532.15KWD 532.15KWD 532.15
2021-02 KWD 560.02KWD 560.02KWD 560.02KWD 560.02
2021-01 KWD 578.30KWD 578.30KWD 578.30KWD 578.30
2020-12 KWD 575.51KWD 575.51KWD 575.51KWD 575.51
2020-11 KWD 577.99KWD 577.99KWD 577.99KWD 577.99
2020-10 KWD 588.52KWD 588.52KWD 588.52KWD 588.52
2020-09 KWD 595.33KWD 595.33KWD 595.33KWD 595.33
2020-08 KWD 609.89KWD 609.89KWD 609.89KWD 609.89
2020-07 KWD 572.10KWD 572.10KWD 572.10KWD 572.10
2020-06 KWD 536.48KWD 536.48KWD 536.48KWD 536.48
2020-05 KWD 531.53KWD 531.53KWD 531.53KWD 531.53
2020-04 KWD 521.30KWD 521.30KWD 521.30KWD 521.30
2020-03 KWD 493.12KWD 493.12KWD 493.12KWD 493.12
2020-02 KWD 494.67KWD 494.67KWD 494.67KWD 494.67
2020-01 KWD 483.52KWD 483.52KWD 483.52KWD 483.52
2019-12 KWD 458.12KWD 458.12KWD 458.12KWD 458.12
2019-11 KWD 455.64KWD 455.64KWD 455.64KWD 455.64
2019-10 KWD 463.07KWD 463.07KWD 463.07KWD 463.07
2019-09 KWD 468.03KWD 468.03KWD 468.03KWD 468.03
2019-08 KWD 464.62KWD 464.62KWD 464.62KWD 464.62
2019-07 KWD 437.67KWD 437.67KWD 437.67KWD 437.67
2019-06 KWD 420.95KWD 420.95KWD 420.95KWD 420.95
2019-05 KWD 397.72KWD 397.72KWD 397.72KWD 397.72
2019-04 KWD 398.33KWD 398.33KWD 398.33KWD 398.33
2019-03 KWD 402.98KWD 402.98KWD 402.98KWD 402.98
2019-02 KWD 408.87KWD 408.87KWD 408.87KWD 408.87
2019-01 KWD 400.19KWD 400.19KWD 400.19KWD 400.19
2018-12 KWD 387.18KWD 387.18KWD 387.18KWD 387.18
2018-11 KWD 378.20KWD 378.20KWD 378.20KWD 378.20
2018-10 KWD 376.34KWD 376.34KWD 376.34KWD 376.34
2018-09 KWD 371.08KWD 371.08KWD 371.08KWD 371.08
2018-08 KWD 372.32KWD 372.32KWD 372.32KWD 372.32
2018-07 KWD 383.47KWD 383.47KWD 383.47KWD 383.47
2018-06 KWD 397.10KWD 397.10KWD 397.10KWD 397.10
2018-05 KWD 403.60KWD 403.60KWD 403.60KWD 403.60
2018-04 KWD 413.51KWD 413.51KWD 413.51KWD 413.51
2018-03 KWD 410.41KWD 410.41KWD 410.41KWD 410.41
2018-02 KWD 412.27KWD 412.27KWD 412.27KWD 412.27
2018-01 KWD 412.27KWD 412.27KWD 412.27KWD 412.27
2017-12 KWD 391.52KWD 391.52KWD 391.52KWD 391.52
2017-11 KWD 397.10KWD 397.10KWD 397.10KWD 397.10
2017-10 KWD 396.48KWD 396.48KWD 396.48KWD 396.48
2017-09 KWD 407.01KWD 407.01KWD 407.01KWD 407.01
2017-08 KWD 397.41KWD 397.41KWD 397.41KWD 397.41
2017-07 KWD 383.16KWD 383.16KWD 383.16KWD 383.16
2017-06 KWD 390.28KWD 390.28KWD 390.28KWD 390.28
2017-05 KWD 385.94KWD 385.94KWD 385.94KWD 385.94
2017-04 KWD 392.45KWD 392.45KWD 392.45KWD 392.45
2017-03 KWD 381.30KWD 381.30KWD 381.30KWD 381.30
2017-02 KWD 382.23KWD 382.23KWD 382.23KWD 382.23
2017-01 KWD 369.22KWD 369.22KWD 369.22KWD 369.22
2016-12 KWD 358.38KWD 358.38KWD 358.38KWD 358.38
2016-11 KWD 383.47KWD 383.47KWD 383.47KWD 383.47