10年の金価格推移(KWD・1キログラムあたり)

10年のKWD建て1キログラムあたり金価格:KWD 12,617.54(2016/10/15)からKWD 41,296.31(2026/10/19)へ、+227.29%の変動。高値KWD 49,992.16(2026/02/15)、安値KWD 11,522.10(2016/12/15)。

10年の金価格推移(KWD・1キログラムあたり)

概要

開始 (2016/10/15)KWD 12,617.54
最新 (2026/10/19)KWD 41,296.31
高値 (2026/02/15)KWD 49,992.16
安値 (2016/12/15)KWD 11,522.10
平均KWD 21,527.39
変動+KWD 28,678.77 (+227.29%)

過去データ

期間始値高値安値終値
2026-10 KWD 41,583.88KWD 41,767.65KWD 41,296.31KWD 41,296.31
2026-09 KWD 43,011.18KWD 43,011.18KWD 43,011.18KWD 43,011.18
2026-08 KWD 43,927.37KWD 43,927.37KWD 43,927.37KWD 43,927.37
2026-07 KWD 40,561.37KWD 40,561.37KWD 40,561.37KWD 40,561.37
2026-06 KWD 42,104.95KWD 42,104.95KWD 42,104.95KWD 42,104.95
2026-05 KWD 45,680.09KWD 45,680.09KWD 45,680.09KWD 45,680.09
2026-04 KWD 47,014.54KWD 47,014.54KWD 47,014.54KWD 47,014.54
2026-03 KWD 48,358.95KWD 48,358.95KWD 48,358.95KWD 48,358.95
2026-02 KWD 49,992.16KWD 49,992.16KWD 49,992.16KWD 49,992.16
2026-01 KWD 47,333.21KWD 47,333.21KWD 47,333.21KWD 47,333.21
2025-12 KWD 42,911.60KWD 42,911.60KWD 42,911.60KWD 42,911.60
2025-11 KWD 40,700.79KWD 40,700.79KWD 40,700.79KWD 40,700.79
2025-10 KWD 40,411.99KWD 40,411.99KWD 40,411.99KWD 40,411.99
2025-09 KWD 36,528.13KWD 36,528.13KWD 36,528.13KWD 36,528.13
2025-08 KWD 33,540.56KWD 33,540.56KWD 33,540.56KWD 33,540.56
2025-07 KWD 33,261.71KWD 33,261.71KWD 33,261.71KWD 33,261.71
2025-06 KWD 33,391.18KWD 33,391.18KWD 33,391.18KWD 33,391.18
2025-05 KWD 32,953.00KWD 32,953.00KWD 32,953.00KWD 32,953.00
2025-04 KWD 32,046.77KWD 32,046.77KWD 32,046.77KWD 32,046.77
2025-03 KWD 29,706.50KWD 29,706.50KWD 29,706.50KWD 29,706.50
2025-02 KWD 28,830.14KWD 28,830.14KWD 28,830.14KWD 28,830.14
2025-01 KWD 26,987.80KWD 26,987.80KWD 26,987.80KWD 26,987.80
2024-12 KWD 26,370.37KWD 26,370.37KWD 26,370.37KWD 26,370.37
2024-11 KWD 26,400.24KWD 26,400.24KWD 26,400.24KWD 26,400.24
2024-10 KWD 26,788.63KWD 26,788.63KWD 26,788.63KWD 26,788.63
2024-09 KWD 25,603.55KWD 25,603.55KWD 25,603.55KWD 25,603.55
2024-08 KWD 24,597.74KWD 24,597.74KWD 24,597.74KWD 24,597.74
2024-07 KWD 23,880.72KWD 23,880.72KWD 23,880.72KWD 23,880.72
2024-06 KWD 23,163.70KWD 23,163.70KWD 23,163.70KWD 23,163.70
2024-05 KWD 23,412.66KWD 23,412.66KWD 23,412.66KWD 23,412.66
2024-04 KWD 23,213.49KWD 23,213.49KWD 23,213.49KWD 23,213.49
2024-03 KWD 21,490.65KWD 21,490.65KWD 21,490.65KWD 21,490.65
2024-02 KWD 20,146.24KWD 20,146.24KWD 20,146.24KWD 20,146.24
2024-01 KWD 20,255.79KWD 20,255.79KWD 20,255.79KWD 20,255.79
2023-12 KWD 20,176.12KWD 20,176.12KWD 20,176.12KWD 20,176.12
2023-11 KWD 19,757.86KWD 19,757.86KWD 19,757.86KWD 19,757.86
2023-10 KWD 19,080.67KWD 19,080.67KWD 19,080.67KWD 19,080.67
2023-09 KWD 19,080.67KWD 19,080.67KWD 19,080.67KWD 19,080.67
2023-08 KWD 19,110.55KWD 19,110.55KWD 19,110.55KWD 19,110.55
2023-07 KWD 19,429.22KWD 19,429.22KWD 19,429.22KWD 19,429.22
2023-06 KWD 19,349.55KWD 19,349.55KWD 19,349.55KWD 19,349.55
2023-05 KWD 19,837.53KWD 19,837.53KWD 19,837.53KWD 19,837.53
2023-04 KWD 19,917.19KWD 19,917.19KWD 19,917.19KWD 19,917.19
2023-03 KWD 19,050.80KWD 19,050.80KWD 19,050.80KWD 19,050.80
2023-02 KWD 18,473.20KWD 18,473.20KWD 18,473.20KWD 18,473.20
2023-01 KWD 18,901.42KWD 18,901.42KWD 18,901.42KWD 18,901.42
2022-12 KWD 17,905.56KWD 17,905.56KWD 17,905.56KWD 17,905.56
2022-11 KWD 17,178.58KWD 17,178.58KWD 17,178.58KWD 17,178.58
2022-10 KWD 16,571.11KWD 16,571.11KWD 16,571.11KWD 16,571.11
2022-09 KWD 16,740.40KWD 16,740.40KWD 16,740.40KWD 16,740.40
2022-08 KWD 17,576.92KWD 17,576.92KWD 17,576.92KWD 17,576.92
2022-07 KWD 17,258.25KWD 17,258.25KWD 17,258.25KWD 17,258.25
2022-06 KWD 18,293.94KWD 18,293.94KWD 18,293.94KWD 18,293.94
2022-05 KWD 18,413.45KWD 18,413.45KWD 18,413.45KWD 18,413.45
2022-04 KWD 19,289.80KWD 19,289.80KWD 19,289.80KWD 19,289.80
2022-03 KWD 19,399.35KWD 19,399.35KWD 19,399.35KWD 19,399.35
2022-02 KWD 18,483.16KWD 18,483.16KWD 18,483.16KWD 18,483.16
2022-01 KWD 18,084.81KWD 18,084.81KWD 18,084.81KWD 18,084.81
2021-12 KWD 17,825.89KWD 17,825.89KWD 17,825.89KWD 17,825.89
2021-11 KWD 18,144.56KWD 18,144.56KWD 18,144.56KWD 18,144.56
2021-10 KWD 17,696.43KWD 17,696.43KWD 17,696.43KWD 17,696.43
2021-09 KWD 17,676.51KWD 17,676.51KWD 17,676.51KWD 17,676.51
2021-08 KWD 17,776.10KWD 17,776.10KWD 17,776.10KWD 17,776.10
2021-07 KWD 18,005.14KWD 18,005.14KWD 18,005.14KWD 18,005.14
2021-06 KWD 18,274.03KWD 18,274.03KWD 18,274.03KWD 18,274.03
2021-05 KWD 18,423.41KWD 18,423.41KWD 18,423.41KWD 18,423.41
2021-04 KWD 17,527.13KWD 17,527.13KWD 17,527.13KWD 17,527.13
2021-03 KWD 17,108.87KWD 17,108.87KWD 17,108.87KWD 17,108.87
2021-02 KWD 18,005.14KWD 18,005.14KWD 18,005.14KWD 18,005.14
2021-01 KWD 18,592.70KWD 18,592.70KWD 18,592.70KWD 18,592.70
2020-12 KWD 18,503.07KWD 18,503.07KWD 18,503.07KWD 18,503.07
2020-11 KWD 18,582.74KWD 18,582.74KWD 18,582.74KWD 18,582.74
2020-10 KWD 18,921.33KWD 18,921.33KWD 18,921.33KWD 18,921.33
2020-09 KWD 19,140.42KWD 19,140.42KWD 19,140.42KWD 19,140.42
2020-08 KWD 19,608.48KWD 19,608.48KWD 19,608.48KWD 19,608.48
2020-07 KWD 18,393.53KWD 18,393.53KWD 18,393.53KWD 18,393.53
2020-06 KWD 17,248.29KWD 17,248.29KWD 17,248.29KWD 17,248.29
2020-05 KWD 17,088.95KWD 17,088.95KWD 17,088.95KWD 17,088.95
2020-04 KWD 16,760.32KWD 16,760.32KWD 16,760.32KWD 16,760.32
2020-03 KWD 15,854.09KWD 15,854.09KWD 15,854.09KWD 15,854.09
2020-02 KWD 15,903.88KWD 15,903.88KWD 15,903.88KWD 15,903.88
2020-01 KWD 15,545.37KWD 15,545.37KWD 15,545.37KWD 15,545.37
2019-12 KWD 14,728.77KWD 14,728.77KWD 14,728.77KWD 14,728.77
2019-11 KWD 14,649.10KWD 14,649.10KWD 14,649.10KWD 14,649.10
2019-10 KWD 14,888.10KWD 14,888.10KWD 14,888.10KWD 14,888.10
2019-09 KWD 15,047.44KWD 15,047.44KWD 15,047.44KWD 15,047.44
2019-08 KWD 14,937.90KWD 14,937.90KWD 14,937.90KWD 14,937.90
2019-07 KWD 14,071.50KWD 14,071.50KWD 14,071.50KWD 14,071.50
2019-06 KWD 13,533.73KWD 13,533.73KWD 13,533.73KWD 13,533.73
2019-05 KWD 12,786.84KWD 12,786.84KWD 12,786.84KWD 12,786.84
2019-04 KWD 12,806.76KWD 12,806.76KWD 12,806.76KWD 12,806.76
2019-03 KWD 12,956.14KWD 12,956.14KWD 12,956.14KWD 12,956.14
2019-02 KWD 13,145.35KWD 13,145.35KWD 13,145.35KWD 13,145.35
2019-01 KWD 12,866.51KWD 12,866.51KWD 12,866.51KWD 12,866.51
2018-12 KWD 12,448.25KWD 12,448.25KWD 12,448.25KWD 12,448.25
2018-11 KWD 12,159.45KWD 12,159.45KWD 12,159.45KWD 12,159.45
2018-10 KWD 12,099.70KWD 12,099.70KWD 12,099.70KWD 12,099.70
2018-09 KWD 11,930.40KWD 11,930.40KWD 11,930.40KWD 11,930.40
2018-08 KWD 11,970.23KWD 11,970.23KWD 11,970.23KWD 11,970.23
2018-07 KWD 12,328.74KWD 12,328.74KWD 12,328.74KWD 12,328.74
2018-06 KWD 12,766.92KWD 12,766.92KWD 12,766.92KWD 12,766.92
2018-05 KWD 12,976.05KWD 12,976.05KWD 12,976.05KWD 12,976.05
2018-04 KWD 13,294.73KWD 13,294.73KWD 13,294.73KWD 13,294.73
2018-03 KWD 13,195.14KWD 13,195.14KWD 13,195.14KWD 13,195.14
2018-02 KWD 13,254.89KWD 13,254.89KWD 13,254.89KWD 13,254.89
2018-01 KWD 13,254.89KWD 13,254.89KWD 13,254.89KWD 13,254.89
2017-12 KWD 12,587.67KWD 12,587.67KWD 12,587.67KWD 12,587.67
2017-11 KWD 12,766.92KWD 12,766.92KWD 12,766.92KWD 12,766.92
2017-10 KWD 12,747.00KWD 12,747.00KWD 12,747.00KWD 12,747.00
2017-09 KWD 13,085.60KWD 13,085.60KWD 13,085.60KWD 13,085.60
2017-08 KWD 12,776.88KWD 12,776.88KWD 12,776.88KWD 12,776.88
2017-07 KWD 12,318.78KWD 12,318.78KWD 12,318.78KWD 12,318.78
2017-06 KWD 12,547.83KWD 12,547.83KWD 12,547.83KWD 12,547.83
2017-05 KWD 12,408.41KWD 12,408.41KWD 12,408.41KWD 12,408.41
2017-04 KWD 12,617.54KWD 12,617.54KWD 12,617.54KWD 12,617.54
2017-03 KWD 12,259.03KWD 12,259.03KWD 12,259.03KWD 12,259.03
2017-02 KWD 12,288.91KWD 12,288.91KWD 12,288.91KWD 12,288.91
2017-01 KWD 11,870.65KWD 11,870.65KWD 11,870.65KWD 11,870.65
2016-12 KWD 11,522.10KWD 11,522.10KWD 11,522.10KWD 11,522.10
2016-11 KWD 12,328.74KWD 12,328.74KWD 12,328.74KWD 12,328.74