Histórico do preço do ouro em 5 anos em MOP por grama

Preço do ouro em MOP por grama em 5 anos: de MOP 461,83 (15 de out. de 2021) para MOP 1.074,43 (19 de out. de 2026), variação de +132,64%. Máxima MOP 1.304,67 em 15 de fev. de 2026, mínima MOP 432,46 em 15 de out. de 2022.

Histórico do preço do ouro em 5 anos em MOP por grama

Resumo

Início (15 de out. de 2021)MOP 461,83
Último (19 de out. de 2026)MOP 1.074,43
Máxima (15 de fev. de 2026)MOP 1.304,67
Mínima (15 de out. de 2022)MOP 432,46
MédiaMOP 727,75
Variação+MOP 612,60 (+132,64%)

Dados históricos

PeríodoAberturaMáximaMínimaFechamento
2026-10 MOP 1.082,67MOP 1.087,56MOP 1.074,43MOP 1.074,43
2026-09 MOP 1.122,48MOP 1.122,48MOP 1.122,48MOP 1.122,48
2026-08 MOP 1.146,39MOP 1.146,39MOP 1.146,39MOP 1.146,39
2026-07 MOP 1.058,55MOP 1.058,55MOP 1.058,55MOP 1.058,55
2026-06 MOP 1.098,83MOP 1.098,83MOP 1.098,83MOP 1.098,83
2026-05 MOP 1.192,14MOP 1.192,14MOP 1.192,14MOP 1.192,14
2026-04 MOP 1.226,96MOP 1.226,96MOP 1.226,96MOP 1.226,96
2026-03 MOP 1.262,05MOP 1.262,05MOP 1.262,05MOP 1.262,05
2026-02 MOP 1.304,67MOP 1.304,67MOP 1.304,67MOP 1.304,67
2026-01 MOP 1.235,28MOP 1.235,28MOP 1.235,28MOP 1.235,28
2025-12 MOP 1.119,89MOP 1.119,89MOP 1.119,89MOP 1.119,89
2025-11 MOP 1.062,19MOP 1.062,19MOP 1.062,19MOP 1.062,19
2025-10 MOP 1.054,65MOP 1.054,65MOP 1.054,65MOP 1.054,65
2025-09 MOP 953,29MOP 953,29MOP 953,29MOP 953,29
2025-08 MOP 875,32MOP 875,32MOP 875,32MOP 875,32
2025-07 MOP 868,05MOP 868,05MOP 868,05MOP 868,05
2025-06 MOP 871,43MOP 871,43MOP 871,43MOP 871,43
2025-05 MOP 859,99MOP 859,99MOP 859,99MOP 859,99
2025-04 MOP 836,34MOP 836,34MOP 836,34MOP 836,34
2025-03 MOP 775,27MOP 775,27MOP 775,27MOP 775,27
2025-02 MOP 752,39MOP 752,39MOP 752,39MOP 752,39
2025-01 MOP 704,31MOP 704,31MOP 704,31MOP 704,31
2024-12 MOP 688,20MOP 688,20MOP 688,20MOP 688,20
2024-11 MOP 688,98MOP 688,98MOP 688,98MOP 688,98
2024-10 MOP 699,12MOP 699,12MOP 699,12MOP 699,12
2024-09 MOP 668,19MOP 668,19MOP 668,19MOP 668,19
2024-08 MOP 641,94MOP 641,94MOP 641,94MOP 641,94
2024-07 MOP 623,23MOP 623,23MOP 623,23MOP 623,23
2024-06 MOP 604,51MOP 604,51MOP 604,51MOP 604,51
2024-05 MOP 611,01MOP 611,01MOP 611,01MOP 611,01
2024-04 MOP 605,81MOP 605,81MOP 605,81MOP 605,81
2024-03 MOP 560,85MOP 560,85MOP 560,85MOP 560,85
2024-02 MOP 525,77MOP 525,77MOP 525,77MOP 525,77
2024-01 MOP 528,63MOP 528,63MOP 528,63MOP 528,63
2023-12 MOP 526,55MOP 526,55MOP 526,55MOP 526,55
2023-11 MOP 515,63MOP 515,63MOP 515,63MOP 515,63
2023-10 MOP 497,96MOP 497,96MOP 497,96MOP 497,96
2023-09 MOP 497,96MOP 497,96MOP 497,96MOP 497,96
2023-08 MOP 498,74MOP 498,74MOP 498,74MOP 498,74
2023-07 MOP 507,05MOP 507,05MOP 507,05MOP 507,05
2023-06 MOP 504,97MOP 504,97MOP 504,97MOP 504,97
2023-05 MOP 517,71MOP 517,71MOP 517,71MOP 517,71
2023-04 MOP 519,79MOP 519,79MOP 519,79MOP 519,79
2023-03 MOP 497,18MOP 497,18MOP 497,18MOP 497,18
2023-02 MOP 482,10MOP 482,10MOP 482,10MOP 482,10
2023-01 MOP 493,28MOP 493,28MOP 493,28MOP 493,28
2022-12 MOP 467,29MOP 467,29MOP 467,29MOP 467,29
2022-11 MOP 448,32MOP 448,32MOP 448,32MOP 448,32
2022-10 MOP 432,46MOP 432,46MOP 432,46MOP 432,46
2022-09 MOP 436,88MOP 436,88MOP 436,88MOP 436,88
2022-08 MOP 458,71MOP 458,71MOP 458,71MOP 458,71
2022-07 MOP 450,40MOP 450,40MOP 450,40MOP 450,40
2022-06 MOP 477,43MOP 477,43MOP 477,43MOP 477,43
2022-05 MOP 480,54MOP 480,54MOP 480,54MOP 480,54
2022-04 MOP 503,42MOP 503,42MOP 503,42MOP 503,42
2022-03 MOP 506,27MOP 506,27MOP 506,27MOP 506,27
2022-02 MOP 482,36MOP 482,36MOP 482,36MOP 482,36
2022-01 MOP 471,97MOP 471,97MOP 471,97MOP 471,97
2021-12 MOP 465,21MOP 465,21MOP 465,21MOP 465,21
2021-11 MOP 473,53MOP 473,53MOP 473,53MOP 473,53
2021-10 MOP 461,83MOP 461,83MOP 461,83MOP 461,83